23gantaak
23gantaak 23gantaak
  • 04-04-2019
  • Mathematics
contestada

BRAINLIEST ANSWER: Two workers finished a job in 7.5 days. How long would it take each worker to do the job by himself if one of the workers needs 8 more days to finish the job than the other worker?

Respuesta :

akeel5
akeel5 akeel5
  • 04-04-2019

Answer:

first we must times 7.5 into 8 to find out what the answer is,

the answer is 60

Answer Link

Otras preguntas

Find all maxima and minima of the function given below. Use a horizontal span of -6 to 6. (Round your answers to two decimal places.) f(x) = 4x 4 + x2
Why does the boss suspect George is trying to pull one over? What is George’s response
4/9 / 9/5= the answer is
what is the value of angle y
What is the periodic table?a. a tool to organize the elements.b. a list of properties of elements.c. a method to name elements.d. a table to record discoveries.
classify each system as independent, dependent, or inconsistent -2x-2y=10 y=x-7
500 increased by 30%
How does the kinetic energy of solids,liquids , and gases compare
Which statement about the House of Representatives is true
Kim is making candy bags. There will be 5 pieces of candy in each bag. She had 53 pieces of candy. She ate 14 pieces of candy. How many candy bags can Kim make