How deep is the service duct bank measured from finish grade to the top of the concrete encasement that runs between the D.L. pad mount transformer and the main electrical switchboard

Respuesta :

RayCrochet RayCrochet
  • 03-10-2019

Answer:2' 6

Explanation:

E1.1

2 feer deep 6 inch divider

Answer Link

Otras preguntas

What element of a timeline helps to mark progress of the project? O A. milestones O B. job responsibilities O C. external deliverables OD. internal tasks
the sliding of oceanic crust below a continent or island is called?
If x=-6, which inequality is right? A. -5-3x>10 B. -3-5x<-14 C. 1-2x>13 D. 2-x<-3
The value of x in this system of equations is 1. 3x + y = 9 y=-4x + 10
which of the following was not part of the reconstruction acts of 1867
Which equation can be used to find x, the length of the hypotenuse of the right triangle?
Which expression is equivalent to 1/4-3/4x?
x^2 + 9x + 20 simplify
Find the slop of (10,5) (18,9)
what Is the belief of paternalism