raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

Write an expression that gives the area of the shaded region in the figure.
Classified by Aristotle, arguments that the writer/ speaker creates are known as __________________. A) Statistics B) Inartistic C) Hard Evidence D) Artistic
If a line passes through the point (2,7) and (7,9), its slope is ____
Which of the following is the missing side length that completes the Pythagorean triple below? 5, 12, ____ A. 17 B. 15 C. 13 D. 14
The person-centered therapist has to be able to acknowledge and understand what the client is feeling and experiencing. this process is referred to as
Blueprints were a low-cost alternative to copying designs onto paper or linen. Where were blueprints first developed?
∫ 5cos(x) - 2sec²(x) dx
18 $1,500,000 will pass outright from grandfather to grandfather's grandson, paul, by virtue of being named as the beneficiary of a bank account in grandfather'
Consider the balanced chemical equation, MgCl2(aq) + 2AgF(aq) → 2AgCl(s) + MgF2(aq) If both reactants are completely consumed and we produce 20 formula units o
Land conservation is a worldwide priority. There are several methods to prevent the loss of land due to a variety of reasons. Which method is not a way to conse