Gideon3071 Gideon3071
  • 03-07-2021
  • Mathematics
contestada

Explain why the probability that the critical path will be finished in 22 weeks or less is not necessarily the probability that the project will be finished in 22 weeks orless.

Respuesta :

xiaoshuai926 xiaoshuai926
  • 03-07-2021

Answer:

The question is very not detailed but I assume that because the path will finish does not mean that the whole thing/project will finish.

Step-by-step explanation:

Answer Link

Otras preguntas

Adams administration’s response to challenge Anti-Federalist fear that the president would have too much power
5. What does the chromosome suggest as one reason why the frogs look different?- thank you if u help !!​
Can you help me with number 29 ?
what do you mean by local technology explain​
what are substances made of metal or nonmetal called?
a) indicate the volume of the liquid and its shape after pouring it into the beakerB) a homogenous (is, is not) uniformly distributed C) Drinking water is a ( h
A rectangular shaped park contains two gardens of multi-colored roses. Sidewalks enclose the whole park and each of the gardens. What is the total length of the
What minus 203 equals 488?
Choose the Athat seems to be congruent to the given one. ΔABD=Δ
Halp I'm already in calculus even I'm still in grade 7...​