patrickmulbah93
patrickmulbah93 patrickmulbah93
  • 04-07-2021
  • Physics
contestada

A body of mass 450g changes it speed from 5ms¹ to 25ms¹. what is the work done by the body?​

Respuesta :

kushm6652 kushm6652
  • 05-07-2021

Answer:

135J

Explanation:

So we know ΔKinetic Energy= ΔWork

Kinetic energy=1/2mv²

So Kf-Ki=ΔK

ΔK=1/2*0.45(25²-5²)=135J

135J=ΔWork

Answer Link

Otras preguntas

Solve the system of equations.3x+3y+6z=33x+2y+6z=74x+4y+7z=4
A 1700 kg 2006 Mustang GT can accelerate from rest to 100 km/h in a time of 5.0 s.  Determine the net amount of work that must be done on the car to cause this
Why do Andhra Pradesh donot recive any snow fall during during winter months. PLEASE HELP.....EXAM TOMORROW
factoring 12m^2n^2-8mn+1=
A construction contractor is purchasing granite tiles for a new kitchen floor. Each tile costs $5 and he wants to spend less than $1,500. The size of each tile
Round 13 513 to the nearest thousand
Kim estimates that the faucet in her kitchen drips at a rate for 1 drop every 2 seconds. Erik wants to klnow how many times the faucet drips in a week.
factoring 12m^2n^2-8mn+1=
2(n-3)=4n+1 this sucks not knowing the answer
Given the inequalities y > 5x-8 and y >3x+4, find the point that satisfies neither inequalities