b74jgrzgnf
b74jgrzgnf b74jgrzgnf
  • 02-10-2021
  • Law
contestada

Your team is discussing the material options before approving the construction contract.
What actions can you take to demonstrate respect? Select all that apply.
Select the 3 answer options that apply.
Disagree with individuals.
Actively listen
Disagree with ideas.
Use a friendly tone

Respuesta :

tbockert232
tbockert232 tbockert232
  • 02-10-2021

Answer:

Listen and friednly tone.

Answer Link

Otras preguntas

Who does a U.S. Senator represent?
Which compound is an electrolyte? (I) CH3CHO (3) CH3COOH (2) CH3OCH3 (4) CH3CH2CH3
Given the balanced equation representing a reaction: 4Al(s) + 3O2(g) ==> Al2O3(s) As the aluminum loses 12 moles of electrons, the oxygen (1) gains 4 moles o
What does the judicial branch do?
what is the value of the underlined digit in 56.123? one is underlined
An art gallery has 9 paintings to display along a hallway. How many different ways can they choose and display 6 of the paintings?
Why did the gap between rich ans poor in Latin America grow after independence.
Why did the gap between rich ans poor in Latin America grow after independence.
Which term represents a type of nuclear reaction? (1) condensation (2) vaporization (3) single replacement (4) natural transmutation
Who is the Commander in Chief of the military?