nikolaungurian nikolaungurian
  • 03-03-2022
  • Mathematics
contestada


It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

NEED HELP WORTH 50 POINTS !! Holly has a rectangular garden that measures 12 m wide by 14 m long. She wants to increase the area to 255 m2 by increasing the wi
What advice would you give someone whose life dream is to become a judge?
Fractures of the blank of long bones are especially common in young animals
what was considered an act of war in 1914?
Kira runs 3 miles in 28 minutes. at the same rate, how many miles would she run in 42 minutes
In the reversible reaction shown below, r moles of a react with s moles of b to produce t moles of c. which equation can be used to represent the equilibrium co
How did the Hellenistic kings spread Greek culture
Toco el piano _______________ hace dos meses. desde se les por
What law required Northerners to assist in the return of runaway slaves
CAN SOMEONE HELP ME PLEASE ?