In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

[tex] \sqrt{ - 1} [/tex]
You happen to come across a piece of metal which has a density of ρ = 7.20 g/cm3 when the temperature is t0 = 55.0 °c. if the metal is cooled to a temperature o
a 12 foot board is split into 5 equal pieces. Which expression shows the length of each piece
How was the election of 1800 decided
Where are building evacuation plans found? - at the main entrance Or - next to exit stairways
What is the equation of the line passing through (2,3) and (5,6)
If you rolled a 6 sided dice what is the probability of rolling a 3
What could the author do to demonstrate more concretely that he does not hate music in paragraph ll- and thus better establish his authority?
Most skilled individuals texting are less likely to have an accident compared to the ones that have to look at their phone?
A cost-benefit analysis for government goods and services provides only an estimate. True False